Cqi27 Casting System Assessment Xls — Upd
Mastering CQI-27: Building an Updatable Excel Casting System Assessment Tool
Sheet 2 – General Facility Requirements
- Management commitment
- Quality system (IATF 16949 / ISO 9001)
- Employee training & certification (e.g., NADCA, ASNT)
3. Multi-Language Support
Many updated XLS versions include drop-downs for English, Spanish, Chinese, and German—critical for global auditing teams.
Post Title: CQI-27 Casting System Assessment (XLS) – Updated Tool & Implementation Guide
Date: [Insert Date]
Author: Quality & Manufacturing Team
Tags: #CQI27 #Casting #HeatTreat #AIAG #SupplierQuality #ExcelTool cqi27 casting system assessment xls upd
Step 1: Pre-Assessment Setup
Open the XLS and enable macros. Navigate to the System Info tab. Enter: Mastering CQI-27: Building an Updatable Excel Casting System
- Foundry name and AIAG supplier code
- Date of assessment
- Casting process type (choose: High Pressure Die Casting / Low Pressure / Gravity / Sand)
- Number of shifts and machines to sample
Tab 4: Job Audit Checklist
Used to verify process adherence on specific production jobs. Management commitment Quality system (IATF 16949 / ISO
- Review of specific Control Plans and Process Flow Diagrams for selected part numbers.
- Verification that operator instructions match the Control Plan.
2. Spreadsheet Structure (Tab Overview)
The Excel workbook is organized into the following distinct sections (tabs):